How to Level Your Subfloors Before Installation

Installing new flooring can transform your home, but ensuring that your subfloor is level is a crucial step that should not be overlooked. A level subfloor ensures that your new hardwood, vinyl, or laminate flooring will be stable, durable, and visually appealing. Here’s a comprehensive guide on how to level your subfloors before installing your new flooring.

1. Gather Your Tools and Materials

Before you begin, make sure you have the necessary tools and materials:

  • Leveling compound

  • Primer for the leveling compound

  • A long level or straightedge

  • Trowel or smoothing tool

  • Tape measure

  • Chalk line

  • Sandpaper or grinder

  • Vacuum or broom

  • Safety gear (gloves, mask, and goggles)

2. Prepare the Subfloor

Clean the Subfloor: Start by thoroughly cleaning the subfloor. Remove any debris, dust, and dirt using a vacuum or broom. This will ensure that the leveling compound adheres properly to the subfloor.

Check for Moisture: Make sure the subfloor is dry. Moisture can cause problems with the leveling compound and the flooring itself. Use a moisture meter to check the subfloor's moisture level. If it's too high, address the moisture issue before proceeding.

3. Inspect the Subfloor

Identify Low and High Spots: Use a long level or straightedge to check for low and high spots on the subfloor. Move the level across the subfloor and mark any uneven areas with a chalk line. Note which areas need filling and which may need sanding or grinding.

Check for Damage: Inspect the subfloor for any damage, such as cracks, holes, or weak spots. Repair any damage before leveling. Replace any sections of the subfloor that are too damaged to repair.

4. Leveling the Subfloor

Fill Low Spots:

  1. Apply Primer: Apply a primer to the areas where you will use the leveling compound. The primer helps the compound adhere to the subfloor.

  2. Mix the Leveling Compound: Follow the manufacturer’s instructions to mix the leveling compound. Mix it to a smooth, lump-free consistency.

  3. Apply the Compound: Pour the leveling compound into the low spots and spread it evenly with a trowel or smoothing tool. Feather the edges to ensure a smooth transition to the rest of the subfloor.

  4. Let it Cure: Allow the leveling compound to cure according to the manufacturer’s instructions. This can take anywhere from a few hours to overnight.

Sand or Grind High Spots:

  1. Sand High Spots: If there are high spots, use sandpaper or a grinder to smooth them out. Be sure to wear safety gear to protect yourself from dust and debris.

  2. Vacuum the Area: Once you’ve finished sanding or grinding, vacuum the subfloor again to remove any dust and debris.

5. Final Check

After the leveling compound has cured, do a final check with your level or straightedge. Ensure that the subfloor is now even and smooth. If you still find any minor imperfections, you may need to apply a bit more leveling compound and repeat the process.

6. Prepare for Flooring Installation

Install Underlayment (if needed): Depending on the type of flooring you’re installing, you may need to add an underlayment. Follow the flooring manufacturer’s recommendations regarding underlayment.

Acclimate Flooring: Allow your new flooring materials to acclimate to the room’s temperature and humidity levels for at least 48 hours before installation. This helps prevent expansion and contraction after installation.

Conclusion

Leveling your subfloor is a vital step in ensuring a successful flooring installation. Whether you're installing hardwood, vinyl, or laminate flooring, a level subfloor provides a stable foundation, prevents damage, and enhances the overall appearance of your floor. By following these steps and taking the time to properly prepare your subfloor, you’ll achieve professional-quality results that will stand the test of time. Happy flooring!

Previous
Previous

How to Remove Wallpaper

Next
Next

How Vinyl Plank Flooring is Made